Factory acceptance
Configuration, component and acceptance checkpoints to confirm before shipment.
Pre-shipment check
Factory acceptance helps overseas buyers confirm the plant scope before container loading, especially for HZS90-HZS240 ready-mix and infrastructure projects.
Export delivery videos
Configuration, component and acceptance checkpoints to confirm before shipment.
Inspection and document checkpoints to review before export shipment.
Send model, capacity, destination country and key configuration needs. We will include factory acceptance points in the quotation follow-up.
FAQ
It is the pre-shipment check of configuration, key components, control system and buyer requirements before export loading.
Yes. We can prepare factory acceptance photos, videos and configuration confirmation for quotation follow-up.
HZS90-HZS240 projects usually need detailed checks because mixer, silo, conveyor and control scope are larger.