Low-carbon recipe flexibility
Plan independent powder storage, screws and weighing lines for cement and supplementary cementitious materials when the approved mix design requires them.
Eastern Region, Riyadh and Makkah project corridors
Plan stable project output, aggregate moisture correction, desert-duty protection, batch records and service readiness for roads, bridges, utilities and heavy-duty concrete works.

Engineering inputs
Starting models: HZS90, HZS120 and HZS180
Model, output and compliance are subject to project engineering, approved mix design and local review.
2026 procurement package
Project-specific quotation
Include city, project type, peak hourly demand, voltage, nearest port, silo/SCM plan and required commissioning date.
2026 global procurement readiness
Current international projects increasingly evaluate the plant as a data-producing quality system, not only as mixing equipment. Select the functions required by the specification; final compliance remains subject to project engineering and local certification.
Plan independent powder storage, screws and weighing lines for cement and supplementary cementitious materials when the approved mix design requires them.
Use aggregate moisture sensing and automatic water correction options to improve repeatability when stockpile moisture changes.
Specify recipe version, material lot, weighing result, alarm and delivery-ticket records with controlled user permissions and export capability.
Organize manuals, declarations, component lists, maintenance records and revision-controlled files through a QR-indexed digital document package.
Evaluate wash-water recovery, recycled-water compatibility and aggregate handling only after laboratory and project-specification confirmation.
Confirm desert temperature, dust, corrosion, wind or seismic conditions, grid standard, truck dispatch pressure and local safety requirements.
Engineering note: these are selectable readiness capabilities, not a declaration that every option is included or that the plant automatically satisfies a specific national regulation.
FAQ
Use HZS90, HZS120 and HZS180 as starting comparisons. Confirm actual hourly demand, truck dispatch, recipes and site constraints before selection.
Eastern Region, Riyadh and Makkah project corridors. Port and inland transport planning must be confirmed for the actual site.
No. It is an engineering pre-selection. Project specifications, Saudi requirements, certification and final component scope require formal review.